natural temporary ground protection 20-50 mm for foundation works
2023-06-21
SECTION 2 EARTHWORKS – United Nations Development Programme
The Contractor shall perform the clearing and grubbing (if any), of top soil consisting mainly of loose soil, vegetable and organic matters, drift sand, unsuitable soil and rubbish by scarifying the areas to be excavated and sidewalks to a minimum depth of 300 mm from the natural ground level.
long life Ground nstruction mats 12.7mm thick for architecture
Our ground protection mats made from 100% recycled high-density polyethy...